The LOLER inspection guide.

Every regulation, interval, report field, and record-keeping rule for lifting equipment compliance in the UK, in one place. Written for duty holders, facilities managers, and the competent persons who examine for them.

LOLER 1998 is a short set of regulations with a long tail of practical questions: which interval applies, who counts as competent, what the report must say, how long to keep it, and what changes when the equipment is a crane, a telehandler, or a box of chain slings. This hub collects every LOLER resource we maintain, organised the way the questions actually arrive.

The regulations

  • LOLER 1998 explained

    The regulations end to end: who is a duty holder, what equipment is covered, and the duties per regulation.

  • ACOP L113 explained

    What an Approved Code of Practice is, its special legal status, and what L113 adds to the bare regulations.

  • What equipment does LOLER apply to?

    A yes, no or depends table: lifts, hoists, stairlifts, MEWPs, forklifts, excavators, chain blocks, slings, ladders and conveyors, each with the reason and the L113 paragraph.

  • The HSE LOLER review

    The 2025 Call for Evidence, what could change, and the no-regrets moves for duty holders.

Thorough examinations

Reports and records

  • LOLER report template

    The 11 paragraphs of Schedule 1 a report of thorough examination must cover, as a printable form, Word and PDF downloads and a filled-in sample.

  • LOLER register template

    Free Excel and printable lifting equipment register: type, SWL, last examination, 6 or 12-month interval, next due date and report reference.

  • Record keeping requirements

    Regulation 11 retention periods by record type, formats, and what HSE inspectors ask to see.

  • When your examiner is a contractor

    Who keeps the hoist and sling records, what HSE says about electronic records, and what to ask your examiner.

Sector guides

  • Hoists and slings in care homes

    Patient hoists, stand aids, bath hoists, stairlifts and slings on the 6-month cycle, pre-use checks, sling labels, defects, records and CQC Regulation 15.

  • LOLER on construction sites

    Telehandlers, excavators used for lifting, site hoists, hired plant duties, and gate checks.

  • Crane examination intervals

    Overhead, mobile, and tower cranes: periodic cycles, after-erection triggers, and the accessory cycle below the hook.

  • LOLER vs OSHA compared

    How the UK regime maps to US lifting equipment requirements for teams working both markets.

Choosing software

Frequently asked

What is LOLER in simple terms?
The Lifting Operations and Lifting Equipment Regulations 1998 are the UK rules for any equipment that lifts or lowers loads at work. They require lifting equipment to be strong and stable enough for its use, positioned to minimise risk, marked with its safe working load, examined thoroughly by a competent person on a fixed cycle, and every examination recorded in a report the duty holder keeps.
How often does lifting equipment need a LOLER examination?
At least every 6 months for lifting accessories and any equipment used to lift people, and at least every 12 months for other lifting equipment (regulation 9(3)(a)). Examinations are also required before first use (unless the equipment is new with a recent declaration of conformity), after installation or assembly at a new location where safety depends on the installation, and after exceptional circumstances such as overload or collision. An examination scheme drawn up by a competent person can vary the periodic intervals.
Who can carry out a LOLER thorough examination?
A competent person: someone with the practical and theoretical knowledge and experience of the equipment to detect defects and assess their significance, with enough independence for objective judgement. ACOP L113 carries the definition. Most duty holders use a third-party examiner or their insurer's engineering service rather than in-house maintenance staff.
Is a LOLER report the same as a report of thorough examination?
In everyday speech yes; legally the document is a report of thorough examination containing the eleven particulars Schedule 1 to LOLER requires. Our report template page lists every field.
How long must LOLER reports be kept?
Under Regulation 11: a periodic examination report until the next report is made or for 2 years, whichever is later; the report of a lifting accessory's first examination before use for 2 years; the first examination of other lifting equipment before use until you stop using it; the examination after installation until the equipment stops being used at that place; records of inspections until the next one; and the declaration of conformity for as long as the equipment is operated.
Is LOLER changing?
HSE ran a Call for Evidence from 1 October to 11 November 2025 reviewing LOLER and the Pressure Systems Safety Regulations, aimed at simplifying the regimes while maintaining standards. No changes are in force: LOLER 1998 and ACOP L113 (2014) continue to apply in full until any reform completes formal consultation and legislation.

Run the whole regime from a scan

Hovermarks Inspection gives every machine and accessory a QR-tagged identity carrying its current report of thorough examination, its next-due date on the correct cycle, and its defect history. Gate checks, insurer queries, and HSE visits are answered by a scan.

Start a 30-day trial · See the LOLER solution

Contains public sector information licensed under the Open Government Licence v3.0. Quotations from legislation and HSE guidance are Crown copyright. Hovermarks is not endorsed by HSE or any other public body.

§ 99  Action

Stop chasing paperwork.
Start proving compliance.

Tag your first asset, run your first inspection, and export an auditor pack, all on your free 30-day trial. No credit card required.

FORM HVK-CTA-01 · v05  ·  signed: hovermarks · uk